HuizhouHeChen Mechanical Equipment Co.,Ltd.
|
Gold Index: 6208
Place of Origin: | Guangdong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
PLC CNC Polyurethane Foaming PU Casting Machine With Automatic Control System
Technology Parameters:
machine model |
HC-201 High Pressure Polyurethane Foaming Machine |
Tank capacity |
300L |
Metering pump |
4 sets |
Speed of pump(r/min) |
2800 |
Precision (%) |
± 0.15 |
Max rotating Speed of injection screw |
4500,8600,10000(optional) |
Clean model |
Auto/ By hand |
Voltage |
380V, 50HZ |
power |
55(kw) |
Flowrate(g/s) |
50 - 800 |
Applicabel Material |
POL, ISO, C-pantene |
Product characteristics |
Colorant tank available if required. Ideal for PU, EPS and other raw materials |
Characteristics:
Applicable products:
PU seat cushion, shoes, memory pillows, and flowers.
Operation condition:
1. Latest configuration system and friendly maintenance.
2. Making safety shoe, leisure shoe, casual shoe, sandal, etc in double density.
3. Suitable for direct soling injection of single PU or colorful PU.
4. Each injection unit is equipped with two colors with accurate measurement of painting.
5. Automatic cleaning
6. Low noise and low energy consumption
7. Stable rotation and accurate positioning.
8 High mold clamping force.
9. Independent PLC control for each station with multi-function.
10 :any colors can be made.
Control system:
1, With the state of the art computer controlled system to gain the machinery more efficiency and reliability.
2, Self-diagnosis, alarming and monitoring functions and multi-language alternatives.
3, Preset technical parameters.
4, Reserve electrical interface for mechanical arm
5, PID closed-loop and self-regulated injection program
6, Automatic PID temperature control
7, Emergent halt protection device.
HC-201 series PU foam injection machine is ideal for shaping equipment to produce world class leather shoes, leisure PU memory pillows, seat cushions, sports shoes etc. Its performance has reached the same level of foreign competitive products and can fill in the very domestic blank.
FAQ:
1. How long will your engineer reach our factory?
Within one week after the machine arrived at your factory.
2. How many days will you finish installing?
For low pressure and high pressure injection machines, 10 days will be enough for our technicians to
complete the equipment installation, erection, start-up commissioning and personnel training.
HuizhouHeChen Mechanical Equipment Co.,Ltd. [China (Mainland)]
Business Type:Manufacturer
City: Shenzhen
Province/State: Guangdong
Country/Region: China (Mainland)