HuizhouHeChen Mechanical Equipment Co.,Ltd.
|
Gold Index: 6208
Place of Origin: | Guangdong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
High Precision Polyurethane Foam Making Machine / Polyurethane Mixing Equipment
Foaming machine New-designed pouring valve
Manual / Auto-cleaning function
Mixing head
1.Mixing by agitator for better mixing performance
2. New-designed pouring valve for precision dosing
3.Auto-cleaning function mix head
Metering pump
1. High precision, low speed gear pump
2. Variable output adjusted by VFD
3. Shaft seal with coupling and DOP
Components storage and temperature conditioning
1. Jacked tanks with visual level tube
2. Digital pressure gauge for control and visualization of pressure with max . alarm value
3. Electrical resistance heater for temperature conditioning
4. Low speed agitator for even temperature distribution
5. Chiller for option
Electrical control system
1. Fully controlled by PLC system
2. Large PCL touch screen computer. Figures of temperature, pressure, rotation speed are
all displaying in the color screen.
3. Alarm function with acoustic warning.
Equipment Introduction
1. Two day tanks for Raw Material A(Pol) and B(ISO). Tanks can be added according to your
componenets. If your products needs colorant, then three day tanks can be realized.
2. Employing PLC central control system, Automatic calibrate metering pump, real time data saving and
inquiry, bilingual language program displaying corresponding values for temperature, pressure,
rotation speed, and proportion.
3. Mixture head's main shaft can reach 8600 r/min, saving raw material and production costs,
reducing wash times, improving production effiency and ensuring products quality.
4.Tank adopts double layers for temperature insulation, which ensures raw materials in your
expected temperature, saving energy and electric;
5. Material hoses and pipelines are employing Thermal conductive insulation layers for ideal
temmperature for materials circulation, realizing the raw materials have constant temperature
during conveying process.
Hydraulic Polyurethane Foam Making Machine in Our Workshop:
FAQ:
1. How long will your engineer reach our factory?
Within one week after the machine arrived at your factory.
2. How many days will you finish installing?
For low pressure and high pressure injection machines, 10 days will be enough for our technicians to
complete the equipment installation, erection, start-up commissioning and personnel training.
For PU molding machine, mold carriers, and sandwich panel production lines, 25 to 30 days are
necessary for our technician to complete the assembly, installation, erection, start-up commissioning
and personnel training.
3. What would be charged for your engineers to install and train our people at ove
HuizhouHeChen Mechanical Equipment Co.,Ltd. [China (Mainland)]
Business Type:Manufacturer
City: Shenzhen
Province/State: Guangdong
Country/Region: China (Mainland)