Post Offer Free
HuizhouHeChen Mechanical Equipment Co.,Ltd.  

Gold Index: 6208

You are here: home  > Low Pressure PLC Control PU Foam Injection Machine For PU Wood Furniture

Low Pressure PLC Control PU Foam Injection Machine For PU Wood Furniture 

Place of Origin: Guangdong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: AIA-1

Low Pressure PLC Control PU Foam Injection Machine For PU Wood Furniture
 
<p style=

Low Pressure PLC Control PU Foam Injection Machine For PU Wood Furniture

 

 

Parameters

 

Model HC-202  
Tank volume 250  

Motor speed of pouring head /

rotation speed

8600r/min
8600
 
Speed of mass meter pump  Adopt invertors for circle control  
Raw Materials temperature and pressure control controled by PLC programe  
pouring head display screen color 7'HMI display screen, (19.7L X 14.2 H, in cm)  
Remote controller

Saving and monitoring temperature of raw materials, pressure, flow

rate, and speed of metering pump

 


 
Total Power 16W  
Heating Mode Electric heating (4.6 KW)  

 

  • Air compressor (max air press 8kg/cm2), long enough air pipe(6.5*10mm)with connectors.
  • Electricity source: 380V/50Hz. Three Phase five lines.
  • Raw material:A(POLY), B(ISO) and MC clean agency.
  • Moulds and release agency.
  • Lift equipment: According to the client’s need. 

 

Electrical control system

 


1. Fully controlled by SCM (Single Chip Microcomputer)


2. Using PCL touch screen computer. Figures of temperature, pressure, rotation speed are

    all displaying in PLC screen.


3. Alarm function with acoustic warning.

 

 

PRODUCT INTRODUCTION


1.  Two day tanks for Raw Material A(Pol) and B(ISO). Tanks can be added according to your

     componenets. If your products needs colorant, then three day tanks can be realized.


2.  Employing PLC central control system, Automatic calibrate metering pump, real time data saving and

     inquiry, bilingual language program displaying corresponding values for temperature, pressure, 

     rotation speed, and proportion.


3. Mixture head's main shaft can reach 8600 r/min, saving raw material and production costs,

    reducing wash times, improving production effiency and ensuring products quality.


4.Tank adopts double layers for temperature insulation, which ensures raw materials in your    

   expected temperature, saving energy and electric;

 

5. Material hoses and pipelines are employing Thermal conductive insulation layers for ideal

   temmperature for materials circulation, realizing the raw materials have constant temperature

   during conveying process.

 

 

Picture of Low Pressure Injection Machine in our workshop:

 

 

 

After services:
 
1. How long will your engineer reach our factory?
    Within one week after machine arrival your factory.


 2. How many days will you finish installing?
   For low pressure and high pressure injection machines, 10 days will be enough for our technicians to

   complete the equipment installation, erection, start-up commissioning and personnel training.

   For PU molding machine, mold carriers, and sandwich panel production lines, 25 to 30 days are

   necessary for our technician to complete the assembly, installation, erection, start-up commissioning

   and personnel training.


 3. What would be charged for your engineers to inst

bigPhoto
 Mr. Lydia Shing

Tel: 86-755-3766356
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

HuizhouHeChen Mechanical Equipment Co.,Ltd. [China (Mainland)]


Business Type:Manufacturer
City: Shenzhen
Province/State: Guangdong
Country/Region: China (Mainland)

You May Like:

Product (122)