HuizhouHeChen Mechanical Equipment Co.,Ltd.
|
Gold Index: 6208
Place of Origin: | Guangdong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Low Pressure PLC Control PU Foam Injection Machine For PU Wood Furniture
Parameters
Model | HC-202 | |
Tank volume | 250 | |
Motor speed of pouring head / rotation speed |
8600r/min 8600 |
|
Speed of mass meter pump | Adopt invertors for circle control | |
Raw Materials temperature and pressure control | controled by PLC programe | |
pouring head display screen | color 7'HMI display screen, (19.7L X 14.2 H, in cm) | |
Remote controller |
Saving and monitoring temperature of raw materials, pressure, flow rate, and speed of metering pump
|
|
Total Power | 16W | |
Heating Mode | Electric heating (4.6 KW) |
Electrical control system
1. Fully controlled by SCM (Single Chip Microcomputer)
2. Using PCL touch screen computer. Figures of temperature, pressure, rotation speed are
all displaying in PLC screen.
3. Alarm function with acoustic warning.
PRODUCT INTRODUCTION
1. Two day tanks for Raw Material A(Pol) and B(ISO). Tanks can be added according to your
componenets. If your products needs colorant, then three day tanks can be realized.
2. Employing PLC central control system, Automatic calibrate metering pump, real time data saving and
inquiry, bilingual language program displaying corresponding values for temperature, pressure,
rotation speed, and proportion.
3. Mixture head's main shaft can reach 8600 r/min, saving raw material and production costs,
reducing wash times, improving production effiency and ensuring products quality.
4.Tank adopts double layers for temperature insulation, which ensures raw materials in your
expected temperature, saving energy and electric;
5. Material hoses and pipelines are employing Thermal conductive insulation layers for ideal
temmperature for materials circulation, realizing the raw materials have constant temperature
during conveying process.
Picture of Low Pressure Injection Machine in our workshop:
After services:
1. How long will your engineer reach our factory?
Within one week after machine arrival your factory.
2. How many days will you finish installing?
For low pressure and high pressure injection machines, 10 days will be enough for our technicians to
complete the equipment installation, erection, start-up commissioning and personnel training.
For PU molding machine, mold carriers, and sandwich panel production lines, 25 to 30 days are
necessary for our technician to complete the assembly, installation, erection, start-up commissioning
and personnel training.
3. What would be charged for your engineers to inst
HuizhouHeChen Mechanical Equipment Co.,Ltd. [China (Mainland)]
Business Type:Manufacturer
City: Shenzhen
Province/State: Guangdong
Country/Region: China (Mainland)